Basic Info.
Color Temperature
3000K, 4000K, 5000K, 6000K, 6500K
Length
0.6m/0.9m/1.2m/1.5m
Shell Type
Frosted or Transparent
Transport Package
Inner Packing + Outer Box
Product Description
Features
1.CE ROHS Approval
2.Oval Shape end caps led tube ,
3.Length: 0.6M/0.9M/1.2M/1,5M for optional .
4.Power: 9W/14W/18W/24W for optional.
5.Material: Aluminium1/2 +PC 1/2
6.tube diameter: 26mm
7.color temperature: WW/NW/CW for optioal
8.SMD 2835 for lighting source.
9.PF>0.9 ,CRI>80
10.Energy saving up to 70% than normal fluorescent lamp
11.Special circuit design, each LED works separately, If one fails, it doesn't affect other LED's work
Special structure design with excellent heat dissipation, 120 viewing angle
Detail Photo :
Parameters:(more items for you choose)Item No. | ES-T8F09-60 | ES-T8F14-90 | ES-T8F18-120 | ES-T8F24-150 | ES-T8F36-240 |
Rated Power | 9W | 14W | 18W | 24W | 36W |
Input Voltage | AC100-265V | AC100-265V | AC100-265V | AC100-265V | AC100-265V |
CRI | >75 | >75 | >75 | >75 | >75 |
View Angle | 120° | 120° | 120° | 120° | 120° |
Luminous Flux(lm) | 800±10% | 1300±10% | 1680±10% | 2400±10% | 3600±10% |
Warm white(WW) | 2700-3000K | 2700-3000K | 2700-3000K | 2700-3000K | 2700-3000K |
Narm white(NW) | 4000-4500K | 4000-4500K | 4000-4500K | 4000-4500K | 4000-4500K |
Pure white(PW) | 6000-6500K | 6000-6500K | 6000-6500K | 6000-6500K | 6000-6500K |
Size | 600mm | 900mm | 1200mm | 1500mm | 2400mm |
Lamp cap | G13 | G13 | G13 | G13 | G13 |
Operating Temperature | -20°~+50° | -20°~+50° | -20°~+50° | -20°~+50° | -20°+50° |
Lifespan(Hrs) | 50000 | 50000 | 50000 | 50000 | 50000 |
Packing
1. All products have label in the tube and inner packing;
2. Packing standard: sealed, braided, labeled w/product description, and quantity;
3. Storage requirment: no wet, no dust, fragile, anti-corrosion liquid, avoid direct sunshine and frozen;
4. Storage period: 1year, must be re-inspected(electricity driver) after 1year.
5. Packing standard: Inner packing + outer box(ref. to attached photo).
Installation
1. Power off before installation.
2. This product protection standard is IP20, indoor only, not for outdoor and cfl emergency lighting system.
3. Must be installed by licenced electrician, must follow the relative power supply instruction (85-265V/60Hz) install this Led tube.
4. For the safety, don't change the Led tube structure.
5. Led tube design comply IEC standard, use G13 socket.
6. Study the menu before install, strictly follow the menu instruction (ref. to attached photo).
FAQQ1: Are you a manufacturer?Yes, we are.
Q2: Can I have sample(s) to test? Yes,welcome to have sample test.
Q3: Do you have the MOQ request?For our developed products, there is no MOQ for the standard products.
Q4: How long can I get my order?The lead time 3-7 working days for sample, and 7-15 working days for bulk order. Sometimes it is shorter or longer according to stock and quantity.
Q5: What is warranty time for your products? If any broken, what I will do?3 years warranty for most of our products. During warranty time, we will arrange the new replacement to you for free of charge.
Q6: Can I get OEM/ODM customized products for special application?Of course, we provide OEM and ODM service, design and produce per customers' requirement.
Q7: What kinds of payment methods do you accept? T/T bank transfer, West Union and L/C at sight
Hot Products
Please don't hesitate to contact, all details can be negotiated.
Address:
Jinhui Techology Park, 10th Longxi Road, Nancheng Street, Dongguan City, Guangdong Province, Dongguan, Guangdong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Lights & Lighting
Management System Certification:
ISO 9001
Company Introduction:
Dongguan Eco-Shine Electronics Co., Ltd located in the world factory-Dongguan, China, which is a professional & advanced LED lighting manufacturer focused on high efficient LED tube with saving power from 55%~90% to replace the traditional fluorescent tube. We have a strong R&D team, reliable production workers, experienced sales and good after-sales service. Under the "saving" policy, we are striving to create environmental protection, energy saving, and long lifespan LED tube, WeeadhereetoomarkettorienteddanddindependenttR&DDmodee.Inntermssoffqualityyassurancee,weeintroduceddISOO90011qualityymanagementtsystemmanddexecuteddaastricttqualityycontrollsystemmfrommincominggmaterialss,processingg,finisheddproductttooshippingg.Alsooestablisheddaaqualityyassuranceesystemmincludinggsupplierrmanagementt,processscheckingg,reliabilityytestt,instrumenttcalibrationn,customerrservicee,etcc.What′ssmoree,theecompanyyhassdevelopeddsystematicctraininggprogramssforrallltheeemployeesstooenhanceetheirrworkkpassionnanddprofessionalizationn.LEDElightingnproductstmeetetoday′s′energygsavingnandnlowocarbonotrendndwewarerwillingntotprovided100%0satisfiedeservicectotyouowithtouruexcellentnqualitytandncostseffectivevproductstsWeWwilllworkrwithtyouotogetheretotilluminateteveryrcornereofothehworldliniorderetotreduceccoststandncontributetthehbenefititotthehgeneralapublicicreturnrusua newegreeneeartht